Search

Article

x

留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

Risk analysis on long inclined-shaft construction in coalmine by TBM techniques based on multiple variables chaotic time series

Hou Gong-Yu Liang Rong Sun Lei Liu Lin Gong Yan-Fen

Citation:

Risk analysis on long inclined-shaft construction in coalmine by TBM techniques based on multiple variables chaotic time series

Hou Gong-Yu, Liang Rong, Sun Lei, Liu Lin, Gong Yan-Fen
PDF
Get Citation

(PLEASE TRANSLATE TO ENGLISH

BY GOOGLE TRANSLATE IF NEEDED.)

Metrics
  • Abstract views:  6595
  • PDF Downloads:  699
  • Cited By: 0
Publishing process
  • Received Date:  23 December 2013
  • Accepted Date:  27 January 2014
  • Published Online:  05 May 2014

/

返回文章
返回
Baidu
map